Best Practices
REVISED AUGUST 2012 How to Run a Flex RhinoBond Job Page 1
THINK OUTSIDE THE SEAMS
With the Flex RhinoBond system, you
have to think differently when it comes to
scheduling and running your job, par-
ticularly when compared to a traditional
mechanically attached installation.
These Best Practice recommendations
are based on several years of Flex
RhinoBond project observation and
evaluation.
It should also be noted that for
improved productivity, a minimum of
two Flex RhinoBond tools should be
used.
FASTENER INSTALLATION
Fasteners MUST be in a straight row in at least
one direction. The more even the spacing, the easier
they are to find under the membrane, and the faster
the installation.
Straight – good
Random – harder to find
Snap chalk lies to layout grid pattern for corners,
perimeter and field. Build an 8' template bar with grid
measurements marked on it to speed up marking for
chalk lines.
How to Run a Flex RhinoBond
®
Job
Page view 0
1 2 3 4

Summary of Contents

Page 1 - Best Practices

Best PracticesREVISED AUGUST 2012 How to Run a Flex RhinoBond Job • Page 1THINK OUTSIDE THE SEAMSWith the Flex RhinoBond system, you have to think

Page 2

How to Run a Flex RhinoBond Job • Page 2Best PracticesFasteners must not be overdriven. They should be tight enough that you can not turn the plates

Page 3

How to Run a Flex RhinoBond Job • Page 3Best Practicescircumstances, especially if the radio is plugged into the same circuit as the tool.TOOL ALIGN

Page 4

Best PracticesRP12222 Rev. 0812RhinoBond® is a trademark of OMG, Inc. Copyright © 2012 OMG, Inc. Used with permission.WELD IN STRAIGHT LINESOperator